Ground-mounted · checked 3 November 2026

Ground-mounted solar panels in Wexford

Panels on a frame in the garden don't need planning permission if all the free-standing panels together cover no more than 25 m², stand no higher than 2.5 m, aren't in front of the house, and leave at least 25 m² of garden behind or beside it.

25 m²of free-standing panels without planning

Get a free price

  • No planning up to 25 m² at a house
  • 60% TAMS 3 grant on farms
  • One installer rings you, not a list
Get a free quote

Last checked 3 November 2026: SEAI grant rules (scheme guide v6.0), Purevolt's and Selectra's published prices and export rates, read at source. Output from EU PVGIS and weather from Met Éireann, pulled the same day.

Do I need planning permission for ground-mounted panels?

Panels on a frame in the garden don't need planning permission if all the free-standing panels together cover no more than 25 m², stand no higher than 2.5 m, aren't in front of the house, and leave at least 25 m² of garden behind or beside it.

RuleExempt from planning at a house if
Total panel areaNo more than 25 m², counting any free-standing panels already there
HeightNo more than 2.5 m above the ground at the highest point
PositionNot forward of the front wall of the house
Garden leftAt least 25 m² of private open space behind or beside the house
Conservation areasOnly if the panels don't materially affect the character of the area
Glint and glarePanels that cause hazardous glint or glare aren't exempt, and must be covered or removed until it's fixed

From S.I. No. 493 of 2022, Planning and Development (Exempted Development) (No. 4) Regulations, Class 2(c). These are the rules for houses; apartments aren't covered. Panels on the roof have their own rules: no more than 15 cm above the roof (50 cm on a flat roof) and at least 50 cm from the edge.

Does the SEAI grant cover ground-mounted panels?

SEAI's guide doesn't say either way: it covers solar PV on the home, and doesn't mention ground mounts, garages or outbuildings.

From SEAI Solar PV Scheme Application Guide, v6.0, 12 Oct 2026 (read 3 Nov 2026). Ask SEAI on (01) 808 2100 or solarpv@seai.ie, and get the answer in writing, before you plan on the grant. On a farm, the Solar Capital Investment Scheme under TAMS 3 pays 60%, with its own €90,000 investment ceiling, and the array can include the needs of one house on the holding (gov.ie, Solar Capital Investment Scheme under TAMS 3).

How much does a ground-mounted array make in Wexford?

A frame can face due south at about 35°, so it makes what a south roof at that angle makes: about 1,056 kWh per kWp a year in Wexford town, 933 in Bunclody.

TownSouth at 35°East and westPanels at 10°
Wexford town1,056825953
Rosslare1,048818946
Kilmore Quay1,045816945
Courtown992783898
Gorey979775887
New Ross975775887
Ferns973774884
Enniscorthy971771884
Bunclody933745850

kWh a year per kWp, from EU PVGIS 5.2, 2005–2020 satellite record, 14% losses, local hills included. PVGIS models building-mounted panels; a free-standing frame is our comparison.

What about wind on an open site?

Johnstown Castle, Met Éireann's station near Wexford town, has recorded gusts of 63 knots since 2009, so ask what wind load the frame and its foundations are rated for.

From Met Éireann, Johnstown Castle 2 monthly records, our reading of the monthly records for 2009–2025. A frame in an open field near the coast takes more wind than panels flat on a roof, so ask for the foundation design on the quote.

FAQ

Quick answers

Do I need planning permission for ground-mounted solar panels?

Panels on a frame in the garden don't need planning permission if all the free-standing panels together cover no more than 25 m², stand no higher than 2.5 m, aren't in front of the house, and leave at least 25 m² of garden behind or beside it. (S.I. No. 493 of 2022, Planning and Development (Exempted Development) (No. 4) Regulations)

Does the SEAI grant cover ground-mounted panels?

SEAI's scheme guide doesn't mention ground-mounted panels, garages or outbuildings; it talks about panels on the home (SEAI Solar PV Scheme Application Guide, v6.0, 12 Oct 2026 (read 3 Nov 2026)). Ask SEAI on (01) 808 2100 or solarpv@seai.ie before you count on the grant.

Is there a grant for ground-mounted solar on a farm?

Farms use the Solar Capital Investment Scheme under TAMS 3: 60% grant, with its own €90,000 investment ceiling, and the array can be sized to include one dwelling house on the holding (gov.ie, Solar Capital Investment Scheme under TAMS 3).

Do ground-mounted panels make more power?

They can face due south at about 35°, so they match a south roof: about 1,056 kWh per kWp a year in Wexford town and 933 in Bunclody (EU PVGIS 5.2).

How much do ground-mounted solar panels cost?

None of the Irish installers we checked publish a ground-mount price, so ask for the frame, the foundations and the cable trench to the house itemised on the quote.

Free price

Get a solar price in 3 quick taps

Tell us about the house. It goes to one local SEAI-registered installer who covers your area, and they ring you with a price.

Which way does the roof face?

South makes the most. East and west work well too, often with panels on both sides.

By sending, you agree to Solar Panels Wexford passing your details to one local SEAI-registered installer who covers your area, so they can contact you with a price. Privacy notice